Bibliography | Ruthardt, Frank: Event-driven Production Rescheduling. University of Stuttgart, Faculty of Computer Science, Electrical Engineering, and Information Technology, Diploma Thesis No. 2988 (2010). 92 pages, german.
|
CR-Schema | D.2.11 (Software Engineering Software Architectures) J.1 (Administration Data Processing)
|
Abstract | This thesis is about optimization of integration in production floors. There is implemented a service-oriented manufacturing service bus based on Open ESB for integrating all necessary systems in production. The proof of concept is done in the Learning Factory (Lernfabrik) of the Institute IFF (Institute für Industrielle Fertigung und Fabrikbetrieb) at the Universität Stuttgart.
|
Full text and other links | PDF (2795621 Bytes) Access to students' publications restricted to the faculty due to current privacy regulations |
Department(s) | University of Stuttgart, Institute of Parallel and Distributed Systems, Applications of Parallel and Distributed Systems
|
Superviser(s) | Minguez Jorge |
Entry date | July 7, 2010 |
---|